{"id":7036,"date":"2024-12-05T20:56:57","date_gmt":"2024-12-05T12:56:57","guid":{"rendered":"http:\/\/www.sinoasia-global.com\/?post_type=product&#038;p=7036"},"modified":"2024-12-05T23:09:49","modified_gmt":"2024-12-05T15:09:49","slug":"hard-rock-tbm","status":"publish","type":"product","link":"http:\/\/www.sinoasia-global.com\/zh\/product\/hard-rock-tbm\/","title":{"rendered":"Hard &#8211; Rock TBM"},"content":{"rendered":"<p><!--more--><\/p>\n<div>\n<h2 style=\"text-align: center;\" title=\"Mining TBM\"><span style=\"color: #ff0000;\"><strong>Mining TBM<\/strong><\/span><\/h2>\n<p>&nbsp;<\/p>\n<\/div>\n<div class=\"tit\">Introduction<\/div>\n<div class=\"article\">\n<p>It is suitable for mining roadway excavation with large slope and small turn.<\/p>\n<\/div>\n<div class=\"tit\">Features<\/div>\n<div class=\"article\">\n<p>1. Independent research and development, with completely independent intellectual property rights;<\/p>\n<p>2. The cutter head adopts HARDOX plate, chromium carbide composite wear-resistant plate and surrounding cemented carbide block, with high wear resistance and long service life;<\/p>\n<p>3. The main drive adopts imported double row cylindrical roller thrust bearing, with ultra long service life and high safety factor;<\/p>\n<p>4. Reliable and efficient PLC control system, real-time online monitoring and data acquisition;<\/p>\n<p>5. Innovative multi variety material transportation system, safe and efficient transportation of segments, filling materials and various construction consumables;<\/p>\n<p>6. The host structure and system layout meet the requirements of in-situ disassembly in the tunnel, and the equipment disassembly and transportation are convenient;<\/p>\n<p>7. The patent single pipe single pump foam system has continuous injection parameters and good system reliability.<\/p>\n<\/div>\n<div class=\"tit\">Parameters<\/div>\n<div class=\"tableshow\">\n<div class=\"table\">\n<table>\n<tbody>\n<tr class=\"firstRow\">\n<td align=\"center\" valign=\"middle\" width=\"133\"><strong>Name<\/strong><\/td>\n<td colspan=\"2\" align=\"center\" valign=\"middle\" width=\"396\"><strong>Parameter<\/strong><\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" width=\"133\">Equipment type<\/td>\n<td align=\"center\" valign=\"middle\" width=\"198\">ZTT4200 Mining TBM<\/td>\n<td align=\"center\" valign=\"middle\" width=\"197\">ZTT5030 Mining TBM<\/td>\n<\/tr>\n<tr>\n<td width=\"133\">Overall length \/ total installed power<\/td>\n<td width=\"198\">Abt.46m \/ Abt.1040kW<\/td>\n<td width=\"197\">Abt.75m \/ Abt.1845kW<\/td>\n<\/tr>\n<tr>\n<td width=\"133\">Excavation \u00a0 diameter \/ main drive power<\/td>\n<td align=\"center\" valign=\"middle\" width=\"198\">4.2m \/ 640kW<\/td>\n<td width=\"197\">5.03m \/ 960kW<\/td>\n<\/tr>\n<tr>\n<td width=\"133\">Tunnel length \/ construction unit<\/td>\n<td width=\"198\">4000m<\/td>\n<td width=\"197\">4500m<\/td>\n<\/tr>\n<tr>\n<td width=\"133\">Date of \u00a0 manufacture \/ date of breakthrough<\/td>\n<td width=\"198\">2019.05 \/2020.10<\/td>\n<td width=\"197\">2020.12\/Ongoing<\/td>\n<\/tr>\n<tr>\n<td width=\"133\">Maximum \u00a0 monthly footage \/ maximum daily footage<\/td>\n<td width=\"198\">260m \/ 33m<\/td>\n<td width=\"197\">Assembling \u00a0 &amp;commissioning<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>&nbsp;<\/p>\n<\/div>\n<\/div>\n<p><!--more--><\/p>\n<h2 style=\"text-align: center;\" title=\"Double shield TBM\"><strong><span style=\"color: #ff0000;\">Double shield TBM<\/span><\/strong><\/h2>\n<div class=\"tit\">Introduction<\/div>\n<div class=\"article\">\n<p>It has two functions of open-type TBM and single shield TBM, which can better adapt to hard rock and soft rock strata.<\/p>\n<\/div>\n<div class=\"tit\">Features<\/div>\n<div class=\"article\">\n<p>1. Probe drilling and advance support the geological conditions in front of tunnel face,which are conducive to geological map description;<\/p>\n<p>2. The cutter head adopts HARDOX plate, chromium carbide composite wear-resistant plate and surrounding cemented carbide block, with high wear resistance and long service life;<\/p>\n<p>3. The main drive adopts imported double row cylindrical roller thrust bearing, with ultra long service life and high safety factor;<\/p>\n<p>4. Reliable and efficient PLC control system, real-time online monitoring and data acquisition;<\/p>\n<p>5. Innovate multi variety material transportation system, safe and efficient transportation of segments, filling materials and various construction consumables;<\/p>\n<p>6. The main machine structure and system layout meet the requirements of in-situ disassembly in the tunnel, and the equipment disassembly and transportation are convenient;<\/p>\n<\/div>\n<div class=\"tit\">Parameters<\/div>\n<div class=\"tableshow\">\n<div class=\"table\">\n<table>\n<tbody>\n<tr class=\"firstRow\">\n<td align=\"center\" valign=\"middle\" width=\"133\">Name<\/td>\n<td colspan=\"2\" align=\"center\" valign=\"middle\" width=\"403\">Parameter<\/td>\n<\/tr>\n<tr>\n<td width=\"133\"><strong>Equipment type<\/strong><\/td>\n<td width=\"196\"><strong>ZTT5490 double shield TBM<\/strong><\/td>\n<td width=\"207\"><strong>ZTT6470 double shield TBM<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"133\">Overall \u00a0 length \/ total installed power<\/td>\n<td width=\"196\">Abt.\u00a0 310m\/ Abt. 4800kW<\/td>\n<td width=\"207\">Abt.150m\/ \u00a0 Abt. 4000kW<\/td>\n<\/tr>\n<tr>\n<td width=\"133\">Excavation \u00a0 diameter \/ main drive power<\/td>\n<td width=\"196\">5.49m\/2100kW<\/td>\n<td width=\"207\">6.47m\/2100kW<\/td>\n<\/tr>\n<tr>\n<td width=\"133\">Tunnel length \/ construction unit<\/td>\n<td width=\"196\">13.28km\/ Sinohydro 3<sup>rd<\/sup>\u00a0Bureau<\/td>\n<td width=\"207\">4.2km\/ CCCC 2<sup>nd<\/sup>\u00a0Highway Engineering<\/td>\n<\/tr>\n<tr>\n<td width=\"133\">Date of \u00a0 manufacture \/ date of breakthrough<\/td>\n<td width=\"196\">2015 .12 \/2018 .3<\/td>\n<td width=\"207\">4.2km\/ \u00a0 CCCC 2<sup>nd<\/sup>\u00a0Highway Engineering<\/td>\n<\/tr>\n<tr>\n<td width=\"133\">Maximum\u00a0 monthly footage \/ maximum daily footage<\/td>\n<td width=\"196\">1251.8m\/676.43m<\/td>\n<td width=\"207\">552m \/408m<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<p><!--more--><\/p>\n<p>&nbsp;<\/p>\n<h2 style=\"text-align: center;\" title=\"Single-shield TBM\"><strong><span style=\"color: #ff0000;\">Single-shield TBM<\/span><\/strong><\/h2>\n<div class=\"tit\">Introduction<\/div>\n<div class=\"article\">\n<p>It is suitable for soft surrounding rock stratum. Synchronous segment lining and belt conveyor slag discharge are adopted.<\/p>\n<\/div>\n<div class=\"tit\">Features<\/div>\n<div class=\"article\">\n<p>1. Probe drilling and advance support the geological conditions in front of tunnel face,which are conducive to geological map description;<\/p>\n<p>2. The cutter head adopts HARDOX plate, chromium carbide composite wear-resistant plate and surrounding cemented carbide block, with high wear resistance and long service life;<\/p>\n<p>3. The main drive adopts imported double row cylindrical roller thrust bearing, with ultra long service life and high safety factor;<\/p>\n<p>4. Reliable and efficient PLC control system, real-time online monitoring and data acquisition;<\/p>\n<p>5. Innovative multi variety material transportation system, safe and efficient transportation of segments, filling materials and various construction consumables;<\/p>\n<p>6. The host structure and system layout meet the requirements of in-situ disassembly in the tunnel, and the equipment disassembly and transportation are convenient;<\/p>\n<\/div>\n<div class=\"tit\">Parameters<\/div>\n<div class=\"tableshow\">\n<div class=\"table\">\n<table>\n<tbody>\n<tr>\n<td align=\"center\" valign=\"middle\" width=\"206\"><strong>Name<\/strong><\/td>\n<td align=\"center\" valign=\"middle\" width=\"225\"><strong>Parameter<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"206\">Equipment type<\/td>\n<td width=\"225\">ZTT6880 Single shield TBM<\/td>\n<\/tr>\n<tr>\n<td width=\"206\">Overall length \/ total installed power<\/td>\n<td width=\"225\">Abt.104m\/ Abt.2260kW<\/td>\n<\/tr>\n<tr>\n<td width=\"206\">Excavation diameter \/ main drive power<\/td>\n<td width=\"225\">6.88m\/1540kW<\/td>\n<\/tr>\n<tr>\n<td width=\"206\">Tunnel length \/ construction unit<\/td>\n<td width=\"225\">3.7km\/ CCCC First Highway Engineering<\/td>\n<\/tr>\n<tr>\n<td width=\"206\">Date of manufacture \/ date of breakthrough<\/td>\n<td width=\"225\">2015.04\/2016.11<\/td>\n<\/tr>\n<tr>\n<td width=\"206\">Maximum monthly footage \/ maximum daily footage<\/td>\n<td width=\"225\">546m\/30m<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<p><!--more--><\/p>\n<p>&nbsp;<\/p>\n<h2 style=\"text-align: center;\" title=\"Open-type gripper TBM\"><strong><span style=\"color: #ff0000;\">Open-type gripper TBM<\/span><\/strong><\/h2>\n<div class=\"tit\">Introduction<\/div>\n<div class=\"article\">\n<p>It is suitable for rock tunnels with high uniaxial compressive strength. The main support method is anchor mesh shotcrete + cast-in-situ lining.<\/p>\n<\/div>\n<div class=\"tit\">Features<\/div>\n<div class=\"article\">\n<p>1. Probe drilling and advance support the geological conditions in front of tunnel face,which are conducive to geological map description;<\/p>\n<p>2.The cutter head adopts HARDOX plate, chromium carbide composite wear-resistant plate and surrounding cemented carbide block, with high wear resistance and long service life;<\/p>\n<p>3.The main drive adopts imported double row cylindrical roller thrust bearing, with ultra long service life and high safety factor;<\/p>\n<p>4.Reliable and efficient PLC control system, real-time online monitoring and data acquisition;<\/p>\n<p>5.Innovate multi variety material transportation system, safe and efficient transportation of segments, filling materials and various construction consumables;<\/p>\n<p>6.The main machine structure and system layout meet the requirements of in-situ disassembly in the tunnel, and the equipment disassembly and transportation are convenient;<\/p>\n<\/div>\n<div class=\"tit\">Parameters<\/div>\n<div class=\"tableshow\">\n<div class=\"table\">\n<table width=\"602\">\n<tbody>\n<tr class=\"firstRow\">\n<td align=\"center\" valign=\"middle\" width=\"129\">Item<\/td>\n<td colspan=\"4\" align=\"center\" valign=\"middle\" width=\"468\">Parameters<\/td>\n<\/tr>\n<tr>\n<td align=\"left\" valign=\"middle\" width=\"129\">Equipment type<\/td>\n<td width=\"85\">ZTT7930 Open-type TBM<\/td>\n<td width=\"101\">ZTT4030 Open-type TBM<\/td>\n<td width=\"129\">ZTT6530 Open-type TBM<\/td>\n<td width=\"149\">ZTT4530 Open-type TBM<\/td>\n<\/tr>\n<tr>\n<td align=\"center\" valign=\"middle\" width=\"129\">Overall length \/ total installed<\/p>\n<p>power<\/td>\n<td width=\"85\">Abt. 190m\/ Abt.5010kW<\/td>\n<td width=\"101\">Abt.290m\/ Abt.2330kW<\/td>\n<td width=\"129\">Abt.250m \/ Abt.450kW<\/td>\n<td width=\"149\">Abt.300m \/Abt.2500kW<\/td>\n<\/tr>\n<tr>\n<td width=\"129\">Excavation diameter \/ \u00a0 main<\/p>\n<p>drive power<\/td>\n<td width=\"85\">7.93m\/3500kW<\/td>\n<td width=\"101\">4.03m\/1400kW<\/td>\n<td width=\"129\">5.53m\/2800kW<\/td>\n<td width=\"149\">4.53m \/ 1400kW<\/td>\n<\/tr>\n<tr>\n<td width=\"129\">Tunnel length \/construction \u00a0 unit<\/td>\n<td width=\"85\">22.6km\/ CRCC 18th \u00a0 Bureau<\/td>\n<td width=\"101\">10.6km\/ Sinohydro 6th \u00a0 Bureau<\/td>\n<td width=\"129\">41.53km \/ Sinohydro 3rd \u00a0 Bureau<\/td>\n<td width=\"149\">10.2km \/ CRCC 18th \u00a0 Bureau<\/td>\n<\/tr>\n<tr>\n<td width=\"129\">Date of manufacture \/ \u00a0 date<\/p>\n<p>of penetration<\/td>\n<td width=\"85\">2014.12 \/2017.08<\/td>\n<td width=\"101\">2017.01\/2018.12<\/td>\n<td width=\"129\">2016.06\/2020.08<\/td>\n<td width=\"149\">2020.07\/ Not \u00a0 completed<\/td>\n<\/tr>\n<tr>\n<td width=\"129\">Maximum monthly<\/p>\n<p>footage \/ average monthly footage<\/td>\n<td width=\"85\">1209.8m\/661.6m<\/td>\n<td width=\"101\">864m\/512m<\/td>\n<td width=\"129\">559.9m \/ 48m<\/td>\n<td width=\"149\">36.6m \/ 602m<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n<\/div>\n<p>&nbsp;<\/p>\n<p><!--more--><\/p>","protected":false},"excerpt":{"rendered":"<h4 title=\"Mining TBM\">Mining TBM<\/h4>\n<p>It is suitable for mining roadway excavation with large slope and small turn<\/p>\n<p><!--more--><\/p>\n<h4 title=\"Double shield TBM\">Double shield TBM<\/h4>\n<p>It has two functions of open-type TBM and single shield TBM, which can better adapt to hard rock and soft rock strata.<\/p>\n<p><!--more--><\/p>\n<h4 title=\"Single-shield TBM\">Single-shield TBM<\/h4>\n<p>It is suitable for soft surrounding rock stratum. Synchronous segment lining and belt conveyor slag discharge are adopted.<\/p>\n<p><!--more--><\/p>\n<h4 title=\"Open-type gripper TBM\">Open-type gripper TBM<\/h4>\n<p>It is suitable for rock tunnels with high uniaxial compressive strength. The main support method is anchor mesh shotcrete + cast-in-situ lining.<\/p>","protected":false},"featured_media":6972,"comment_status":"open","ping_status":"closed","template":"","meta":{"_uag_custom_page_level_css":"","site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"normal-width-container","site-content-style":"boxed","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-gradient":""}}},"product_cat":[45,48],"product_tag":[],"class_list":{"0":"post-7036","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-45","7":"product_cat-tunnel-boring-machine","8":"desktop-align-left","9":"tablet-align-left","10":"mobile-align-left","12":"first","13":"instock","14":"shipping-taxable","15":"product-type-simple"},"uagb_featured_image_src":{"full":["http:\/\/www.sinoasia-global.com\/wp-content\/uploads\/2024\/12\/s_2301061621112672442.jpg",549,412,false],"thumbnail":["http:\/\/www.sinoasia-global.com\/wp-content\/uploads\/2024\/12\/s_2301061621112672442-150x150.jpg",150,150,true],"medium":["http:\/\/www.sinoasia-global.com\/wp-content\/uploads\/2024\/12\/s_2301061621112672442-300x225.jpg",300,225,true],"medium_large":["http:\/\/www.sinoasia-global.com\/wp-content\/uploads\/2024\/12\/s_2301061621112672442.jpg",549,412,false],"large":["http:\/\/www.sinoasia-global.com\/wp-content\/uploads\/2024\/12\/s_2301061621112672442.jpg",549,412,false],"1536x1536":["http:\/\/www.sinoasia-global.com\/wp-content\/uploads\/2024\/12\/s_2301061621112672442.jpg",549,412,false],"2048x2048":["http:\/\/www.sinoasia-global.com\/wp-content\/uploads\/2024\/12\/s_2301061621112672442.jpg",549,412,false],"trp-custom-language-flag":["http:\/\/www.sinoasia-global.com\/wp-content\/uploads\/2024\/12\/s_2301061621112672442.jpg",16,12,false],"woocommerce_thumbnail":["http:\/\/www.sinoasia-global.com\/wp-content\/uploads\/2024\/12\/s_2301061621112672442-300x300.jpg",300,300,true],"woocommerce_single":["http:\/\/www.sinoasia-global.com\/wp-content\/uploads\/2024\/12\/s_2301061621112672442.jpg",549,412,false],"woocommerce_gallery_thumbnail":["http:\/\/www.sinoasia-global.com\/wp-content\/uploads\/2024\/12\/s_2301061621112672442-100x100.jpg",100,100,true]},"uagb_author_info":{"display_name":"admin","author_link":"http:\/\/www.sinoasia-global.com\/zh\/author\/"},"uagb_comment_info":0,"uagb_excerpt":"Mining TBM It is suitable for mining roadway excavation with large slope and small turn Double shield TBM It has two functions of open-type TBM and single shield TBM, which can better adapt to hard rock and soft rock strata. Single-shield TBM It is suitable for soft surrounding rock stratum. Synchronous segment lining and belt&hellip;","_links":{"self":[{"href":"http:\/\/www.sinoasia-global.com\/zh\/wp-json\/wp\/v2\/product\/7036","targetHints":{"allow":["GET"]}}],"collection":[{"href":"http:\/\/www.sinoasia-global.com\/zh\/wp-json\/wp\/v2\/product"}],"about":[{"href":"http:\/\/www.sinoasia-global.com\/zh\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"http:\/\/www.sinoasia-global.com\/zh\/wp-json\/wp\/v2\/comments?post=7036"}],"wp:featuredmedia":[{"embeddable":true,"href":"http:\/\/www.sinoasia-global.com\/zh\/wp-json\/wp\/v2\/media\/6972"}],"wp:attachment":[{"href":"http:\/\/www.sinoasia-global.com\/zh\/wp-json\/wp\/v2\/media?parent=7036"}],"wp:term":[{"taxonomy":"product_cat","embeddable":true,"href":"http:\/\/www.sinoasia-global.com\/zh\/wp-json\/wp\/v2\/product_cat?post=7036"},{"taxonomy":"product_tag","embeddable":true,"href":"http:\/\/www.sinoasia-global.com\/zh\/wp-json\/wp\/v2\/product_tag?post=7036"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}